Rock Room Prior to Excavation Pipe
to Be Removed in Rock Room
Rock to Be Removed in Crawlspace Rock to Be Removed in Crawlspace
Two Weeks of Excavation in Rock Room Relief Cut in Rock Room
Jimmy Clair, Rock Removal Expert “Cap” Rock Prior to Removal
Toby Layton
Cutting “Cap” Rock
First Saw Cut on “Cap”
Rock
Jimmy Clair with Another Trophy Large Portion of Removed Rock
Toby Layton Cutting
1st Duct Opening Completed Openings in Commissary Bath
Temporary Controls in Commissary Bath Continued Excavation in Rock Room
Relief Cut In Rock Room JRCCI Staging Area at Scotty’s Tower
Continued Rock Removal Two Relief
Cuts in Rock Room
Visqueen Placed in
Rock Room Jack
in Place for Concrete Pour
Pipe Demolition in Mechanical Tunnel Pipe Demolition in “45” Tunnel
Pipe Demo in Mrs. Johnson’s Apt. Chase Pipe
Ready for Removal
Structural Steel in Enclosed Patio Crew Ready to Place Steel in Enclosed Patio
Drilling for Anchors in Enclosed Patio
Temporary Controls in Breezeway Temporary Controls in Basement
Temporary Controls in Basement Temporary Controls in Basement
Temporary Controls in Basement Toby
Layton
Cutting Outside Air Opening
Complete Pipe Demo in Mechanical Tunnel Boiler in Basement
Manuel Rodriguez Placing Temp. Controls Overhead Cut in Enclosed Patio
Jimmy Clair Drilling For Underpinning Jack
in Place, Ready for Rock Removal
Manuel & Benito Rodriguez Removing Block
Crawlspace
Prior to Abatement
Crawlspace Prior to Abatement Overhead Duct Opening Removed in 5 Pcs.
Duct Opening in Organ Blower Room Bristar doing its Job
Abatement Ventilation Properly Suited Abatement Worker
& Curtain
Abatement Ventilation Structural Steel Temporarily
Hung
Steel Tied in Place & Ready for Forming Form in Place for First Concrete Pour
Abatement of Rock Room Jerome Cardenas Overseeing Slump Test
Even the Park Service Got Put to Work
Block Removed From Enclosed Patio Opening
Between OBR & Enclosed Patio
Overhead Drilling for Vertical Rebar Rock
Removed From New Equipment Room
Side View of Rock Removed From Rock Room
Brad Nelson Plumbing Basement
Eric Nelson Cleaning Copper Lines Welding Water Lines in “45” Tunnel
Close up Shot of Brad Nelson Welding Duct Opening in Foyer Closet
Hydraulic Pump & Vacuum Outside Window
Completed Concrete Pour
Holes Drilled Into Beams in Upstairs Hall Duct
Openings & Fire Sprinkler Riser in Closet
Fire Sprinkler Holes in Upstairs Bedroom Preparing For Concrete Pour
Shoring
at Concrete Forms Bracing For Undermined Rock
Bracing For Undermined Rock Ductwork in Organ Blower Room
Continued Rock Excavation Toby
Layton & Bill Semas Cutting UMR Floor
Toby Layton
Cutting UMR Floor Temporary
Controls in Upper Music Room
David Moore Placing Bristar in Cored Holes
David Moore As Seen Through UMR Opening
Bill Semas Placing Temporary Controls Toby
Layton Core Drilling For
Sprinkler Pipe
Toby Layton
Core Drilling For Sprinkler Pipe David
Moore Cutting Rebar For Concrete Pour
David Moore Cutting Rebar For Concrete Pour Units
& Ductwork in Organ Blower Room
Benito Rodriguez Making Relief Cut in RR Placing Mr. Johnson’s Office Floor Grille
Fire Damper & Grille Frame Installed Core Drilling for Fire Sprinkler Pipe in Tower
Core Drilling For Final Concrete Pour Valves in Place and Connected to Unit
Tony Mascaro Placing Valves & Pumps Ductwork in the Basement – HP 9 & 10
Ductwork in the Mechanical Tunnel John Ferminick Sorting
Crawlspace Ductwork
Placing Ductwork in Crawlspace Above Patio Placing Fire Sprinkler Line in UMR
Fire Sprinkler line in UMR Ready for Paint
Rock Excavation
Copper Piping in Basement Copper Piping in Basement
Copper Piping in Basement Copper Piping in Basement
Brad Nelson Welding in Basement Forms in Place for Concrete Pour
Completed Concrete Pour Pipe Demolition in Crawlspace
Dave Moore Removing Pipe Toby Layton
Enjoying Life in the Crawlspace
Continued Rock Removal Rock Room Looking
East
Rock Removal for Concrete Pour Core Drilling For Fire Sprinkler
Line
Cutting for Concrete Pour Cutting for Concrete
Pour
Insulating Plumbing in Basement Mastic Coating on Plumbing in Basement
Fire Sprinkler Line in Basement Chase Fire Sprinkler Line in Mechanical Tunnel
Fire Sprinkler Piping in Mechanical Chase Removal of Large Rocks
Continued Removal of Large Rocks Benito & Marco Taking a Break
Largest Rock Encountered During Excavation
The Large Rock From a Different Angle
Epoxied Anchors in
Soffet Area Fire Sprinkler Opening in the Foyer
Benito Rodriguez Cutting Duct Opening
Dave Moore & Marco under Music Room Stage
Ductwork in Organ Blower Room “Rock Room”
Marco Drilling in Crawlspace Under Stage Fire
Lines in East Organ Pipe Room
Duct Placement in Main Mechanical Tunnel Mr. Johnson’s
Office Floor Grill
PERFECT FIT!!
New Equipment Room Duct Openings in Mini Room
Ductwork in Mechanical Tunnel Ductwork @ HP 9 & 10
Pipe Fabrication Fire
Dampers in Enclosed Patio
Close up of Mr. Johnson’s
Office Cut Bill Semas Placing Mineral Wool & Caulk
Bottom of Music Room Opening Ductwork
in Commissary Bathroom
Progression of Ductwork in Basement Marco in His Hole
Toby Layton and “THE ROCK PILE”
Willy
Eating a Mouse
Prepping For Last Concrete Under Pinning
Mechanical Tunnel In Basement
Music Room Fire Sprinkler Lines Upper Music Room Cut
Duct Openings in New Equipment Room Floor Grille in Upstairs Guest Bedroom
Fire Sprinkler Piping Outside Italian Room Outside Air in Organ Blower Room
Floor Grille in Mr. Johnson’s Office Bill Semas Placing Pipe in Mr. Johnson’s
Office
Opening into Upper Music Room Floor Grille Completed Ductwork in Commissary Bath
JRCCI Pouring Floor in Rock Room JRCCI Preparing For Concrete Pour
Completed Concrete Floor Insulation Above Upstairs Hallway
Steel Studs in Enclosed Patio Steel Studs in Enclosed Patio
Fire Door at West Entrance to “Rock Room” Supply Grille Under Stove in Bessie’s Apt.
Completed Soffet in Enclosed Patio
Completed Fire Door in Basement
HP 9 & 10 in Basement Firewall Above Door
in Basement
Outside Air Fire Damper in Basement Replacement Ductwork in Basement
HP
9 & 10 in Basement
Fire Sprinklers in Mrs.
Johnson’s Apartment
Fire Sprinkler Head in Tower Fire Sprinkler Outside Upper Music Room
Floor Grille in Upper Music Room Sidewall
Heads in Upper Music Room
Fire Sprinkler Lines in Upper Music Room
Fire Sprinkler Heads in Hallway
Return Grille in Upstairs Closet Fire Sprinkler Lines in Italian Room
Fire Sprinkler Line Outside of Italian Room Door Latch in the Foyer
New Equipment Room August, 2003
New Equipment Room March, 2004
|