Rock Room Prior to Excavation Pipe
to Be Removed in Rock Room

Rock to Be Removed in Crawlspace Rock to Be Removed in Crawlspace

Two Weeks of Excavation in Rock Room Relief Cut in Rock Room

Jimmy Clair, Rock Removal Expert “Cap” Rock Prior to Removal

Toby Layton
Cutting “Cap” Rock
First Saw Cut on “Cap”
Rock

Jimmy Clair with Another Trophy Large Portion of Removed Rock

Toby Layton Cutting
1st Duct Opening Completed Openings in Commissary Bath

Temporary Controls in Commissary Bath Continued Excavation in Rock Room

Relief Cut In Rock Room JRCCI Staging Area at Scotty’s Tower

Continued Rock Removal Two Relief
Cuts in Rock Room

Visqueen Placed in
Rock Room Jack
in Place for Concrete Pour

Pipe Demolition in Mechanical Tunnel Pipe Demolition in “45” Tunnel

Pipe Demo in Mrs. Johnson’s Apt. Chase Pipe
Ready for Removal

Structural Steel in Enclosed Patio Crew Ready to Place Steel in Enclosed Patio

Drilling for Anchors in Enclosed Patio

Temporary Controls in Breezeway Temporary Controls in Basement

Temporary Controls in Basement Temporary Controls in Basement

Temporary Controls in Basement Toby
Layton
Cutting Outside Air Opening

Complete Pipe Demo in Mechanical Tunnel Boiler in Basement

Manuel Rodriguez Placing Temp. Controls Overhead Cut in Enclosed Patio

Jimmy Clair Drilling For Underpinning Jack
in Place, Ready for Rock Removal

Manuel & Benito Rodriguez Removing Block
Crawlspace
Prior to Abatement

Crawlspace Prior to Abatement Overhead Duct Opening Removed in 5 Pcs.

Duct Opening in Organ Blower Room Bristar doing its Job

Abatement Ventilation Properly Suited Abatement Worker
& Curtain

Abatement Ventilation Structural Steel Temporarily
Hung

Steel Tied in Place & Ready for Forming Form in Place for First Concrete Pour

Abatement of Rock Room Jerome Cardenas Overseeing Slump Test

Even the Park Service Got Put to Work

Block Removed From Enclosed Patio Opening
Between OBR & Enclosed Patio

Overhead Drilling for Vertical Rebar Rock
Removed From New Equipment Room

Side View of Rock Removed From Rock Room
Brad Nelson Plumbing Basement

Eric Nelson Cleaning Copper Lines Welding Water Lines in “45” Tunnel

Close up Shot of Brad Nelson Welding Duct Opening in Foyer Closet

Hydraulic Pump & Vacuum Outside Window
Completed Concrete Pour

Holes Drilled Into Beams in Upstairs Hall Duct
Openings & Fire Sprinkler Riser in Closet

Fire Sprinkler Holes in Upstairs Bedroom Preparing For Concrete Pour

Shoring
at Concrete Forms Bracing For Undermined Rock

Bracing For Undermined Rock Ductwork in Organ Blower Room

Continued Rock Excavation Toby
Layton & Bill Semas Cutting UMR Floor

Toby Layton
Cutting UMR Floor Temporary
Controls in Upper Music Room

David Moore Placing Bristar in Cored Holes
David Moore As Seen Through UMR Opening

Bill Semas Placing Temporary Controls Toby
Layton Core Drilling For
Sprinkler Pipe

Toby Layton
Core Drilling For Sprinkler Pipe David
Moore Cutting Rebar For Concrete Pour

David Moore Cutting Rebar For Concrete Pour Units
& Ductwork in Organ Blower Room

Benito Rodriguez Making Relief Cut in RR Placing Mr. Johnson’s Office Floor Grille

Fire Damper & Grille Frame Installed Core Drilling for Fire Sprinkler Pipe in Tower

Core Drilling For Final Concrete Pour Valves in Place and Connected to Unit

Tony Mascaro Placing Valves & Pumps Ductwork in the Basement – HP 9 & 10

Ductwork in the Mechanical Tunnel John Ferminick Sorting
Crawlspace Ductwork

Placing Ductwork in Crawlspace Above Patio Placing Fire Sprinkler Line in UMR

Fire Sprinkler line in UMR Ready for Paint
Rock Excavation

Copper Piping in Basement Copper Piping in Basement

Copper Piping in Basement Copper Piping in Basement

Brad Nelson Welding in Basement Forms in Place for Concrete Pour

Completed Concrete Pour Pipe Demolition in Crawlspace

Dave Moore Removing Pipe Toby Layton
Enjoying Life in the Crawlspace

Continued Rock Removal Rock Room Looking
East

Rock Removal for Concrete Pour Core Drilling For Fire Sprinkler
Line

Cutting for Concrete Pour Cutting for Concrete
Pour

Insulating Plumbing in Basement Mastic Coating on Plumbing in Basement

Fire Sprinkler Line in Basement Chase Fire Sprinkler Line in Mechanical Tunnel

Fire Sprinkler Piping in Mechanical Chase Removal of Large Rocks

Continued Removal of Large Rocks Benito & Marco Taking a Break

Largest Rock Encountered During Excavation
The Large Rock From a Different Angle

Epoxied Anchors in
Soffet Area Fire Sprinkler Opening in the Foyer

Benito Rodriguez Cutting Duct Opening
Dave Moore & Marco under Music Room Stage

Ductwork in Organ Blower Room “Rock Room”

Marco Drilling in Crawlspace Under Stage Fire
Lines in East Organ Pipe Room

Duct Placement in Main Mechanical Tunnel Mr. Johnson’s
Office Floor Grill
PERFECT FIT!!

New Equipment Room Duct Openings in Mini Room

Ductwork in Mechanical Tunnel Ductwork @ HP 9 & 10

Pipe Fabrication Fire
Dampers in Enclosed Patio

Close up of Mr. Johnson’s
Office Cut Bill Semas Placing Mineral Wool & Caulk

Bottom of Music Room Opening Ductwork
in Commissary Bathroom

Progression of Ductwork in Basement Marco in His Hole

Toby Layton and “THE ROCK PILE”
Willy
Eating a Mouse

Prepping For Last Concrete Under Pinning
Mechanical Tunnel In Basement

Music Room Fire Sprinkler Lines Upper Music Room Cut

Duct Openings in New Equipment Room Floor Grille in Upstairs Guest Bedroom

Fire Sprinkler Piping Outside Italian Room Outside Air in Organ Blower Room

Floor Grille in Mr. Johnson’s Office Bill Semas Placing Pipe in Mr. Johnson’s
Office

Opening into Upper Music Room Floor Grille Completed Ductwork in Commissary Bath

JRCCI Pouring Floor in Rock Room JRCCI Preparing For Concrete Pour

Completed Concrete Floor Insulation Above Upstairs Hallway

Steel Studs in Enclosed Patio Steel Studs in Enclosed Patio

Fire Door at West Entrance to “Rock Room” Supply Grille Under Stove in Bessie’s Apt.

Completed Soffet in Enclosed Patio
Completed Fire Door in Basement

HP 9 & 10 in Basement Firewall Above Door
in Basement

Outside Air Fire Damper in Basement Replacement Ductwork in Basement

HP
9 & 10 in Basement
Fire Sprinklers in Mrs.
Johnson’s Apartment

Fire Sprinkler Head in Tower Fire Sprinkler Outside Upper Music Room

Floor Grille in Upper Music Room Sidewall
Heads in Upper Music Room

Fire Sprinkler Lines in Upper Music Room
Fire Sprinkler Heads in Hallway

Return Grille in Upstairs Closet Fire Sprinkler Lines in Italian Room

Fire Sprinkler Line Outside of Italian Room Door Latch in the Foyer

New Equipment Room August, 2003

New Equipment Room March, 2004
|