DEATH VALLEY NATURAL HISTORY ASSOCIATION
OFFICE / WAREHOUSE PROJECT

Death Valley, California.


START DATE: November 10, 2001
CONTRACT COMPLETION DATE: May 15, 2002

SCOPE OF WORK:


Construction of a new 3060 square foot combined office warehouse building. PEMB, concrete slab on grade, masonry, metal stud interior partitions, gypsum board, cabinets, windows, suspended acoustical ceiling, doors, electrical, HVAC, plumbing, fire sprinkler, fire alarm, data base conduit & wiring. Special Construction – R-43 insulation for Roof and Walls.



  
      Project Site                                                                      Loading Dock Site


  
Pothole For Water Supply                                                Water Tap & Main Valve


  
      Water Supply Line                                                        Main Water Supply Valve


  
Sewer Connection @ Main                                                    Sewer Cleanout @ Main


  
            Sewer Line                                                              Sewer Connection For Cleanout


  
Sewer Cleanout @ Building                                                          Toilet & Sink Drains


              
    Toilet Sewer Lines                                                                 Water Supply Valve


            
Common Trench for Elec., Telephone, & Water                                           Perimeter Footings                     


         
        Perimeter Footings                                                       Rebar in Masonry Footings


         
   Rebar in Masonry Footings                                                Rebar in Block Loading Dock


   
Importing of RO Water for Masonry                                      Completed Block Loading Dock


         
            Placement of 10 Mil Poly in Footers                                                   Poly in Column Footings                        


      
                  Forms & Compacted Base                                                           Pouring of Concrete                       


      
                          Building Slab                                                                    Placing Curing Blankets                   


      
 Kelly Penrod Placing First Column                                                       Building Layout                                     


    
        Placing First Beam                                                           Placing High/Low Roof Beam


   
         Framing of Windows                                                     Framing of Windows & Door Way


   
                 Unused Vent Framing                                              Heavy Iron And Purlins in Place West View


   
Heavy Iron And Purlins in Place South Views


   
Infrastructure Fascia Trim                                                            High Foundation Wall


    
                      Portal Frame Attachment                                                           Attaching of Wall Panels                      


    
Layout of Interior Walls                                                             Epoxy Anchor Bolts


  
Interior Wall Framing                                                               High Rider System


   
Purlin Cap and High Rider System                                               Dry pack in Front Porch Area


   
Anchor Bolt Placement


   
                        Framed Interior Walls                                                          Framing of Windows                       



Girders & Purlins In Place


   
    Wood Trim on Beams For Drywall Placement                  Framing of Doors & Windows @ Loading Dock


   
         Roof Purlins                                                                   Exterior Wall Framing


         
    Wall Panel Connection                                                    Alex Lopez Cutting Wall Panels


    
Placing Soffet Panels in Font Porch Area                                                  Completed Wall Panels           


     
 Placing Roof Insulation & Panels                                                             South Elevation            


    
             Thrust Block Under Slab                                                         Coring For Fire Supply Riser          


    
       Under-Slab Fire Supply Line                                       Ductile Connection For Fire Supply


    
                     Fire Supply Line                                          Dave Moore Compacting Fire Supply Line


   
 Pressure Tested For 2 Hours @ 150 PSI                              Water Supply @ Backflow Preventer    


    
Jimmy Clair With Completed Backflow Preventer                           Backflow Preventer Ready For Cement       


   
    Irrigation Line                                                                 Warehouse HVAC Unit


   
Office HVAC Duct Work                                                 Warehouse HVAC Unit


   
   Office HVAC System                                                  Bathroom Exhaust Fans


   
   Exhaust Vent Penetration to Exterior of Building           Rough In Plumbing For Water Heater & Mop Sink


   
Completed Bathroom Rough In Plumbing                                   Rough in Bathroom Plumbing        


   
East Wall Insulation & Framing                                        South Wall Insulation & Framing


         
      Firewall & High Wall Steel Framing                                    Wall Insulation & Electrical Conduits


            
        Roof & Wall Insulation                                                      Plywood Skin in Warehouse


                               
              Un-taped Drywall in Hallway                                              Hanging Suspended Acoustical Ceiling Grid


                
                  Bathroom Cabinet                     Greg Mayhan Placing Chair Rail         Steve Lewis Hanging an Exterior Door


    
Installation of Chair Rail in Exec. Director’s Office                                   Fire Wall in Warehouse                  


                               
                High/Low Roof Wall                                                    Jason Hoehn Installing Interior Horn/Strobe


           
Shawn Lovato Connecting Water Flow Switch                        Installation of Suspended Acoustical Ceiling


          
                    Fire Alarm Circuit Board                              Shawn Lovato & Jason Hoehn Testing Fire Alarm System


   
      Jason Hoehn Installing Exterior Horn/Strobe                    Jerome Cardenas Hanging Telephone Backboard


                       
     Data & Voice Cabling                                                             Data & Voice Punch box


       
    Exhaust Fan & Hood                                                      Main Breaker & A/C Unit


       
Bump Stop Installation                                                                  Dust Storm          


    
Finished Bathroom                                                              Water Heater


     
Telephone Conduit @ Pedestal With Thrust Block                                          East Elevation                          


     
    North Elevation                                                                 South Elevation



November 28, 2001



May 14, 2002